The workpiece into the active pressure roller between, (According to the ring cover to adjust the location of the work support) operating(Press / release) button, Pressing the workpiece, operation(Start) button, start the host (Make sure that the rotation direction of the spindle is the cutting direction). Operation (down) button, cutting the spindle down, adjust the outer ring slotted qualified position, according to the actual situation to adjust the amount of feed, so go week, operation (rise) button, up about 10-15mm is appropriate, Operation (stop) button, stop the host, the operation (compression / relaxation) button, remove the workpiece, complete the entire operation process.

咨询和报价

您的电子邮箱地址不会被公开。